Project Description

As a member of the program management team, Wagner Engineering & Survey, Inc. (WES) has performed GPS control surveys, aerial mapping, right-of-way parcel surveys, prepared over 800 legal descriptions and plat maps for full or partial takings, permanent easements and temporary construction easements over the last 17 years; and performed detailed field surveys for an ongoing construction program of 12 grade separations over and under heavy rail tracks, for over 35-miles. Forty street crossings over railroad tracks were surveyed, mapped and improved physically and/or with signalization for safety improvements. Project locations include:

  • Ramona Blvd. Grade Separation
  • East End Avenue Grade Separation
  • Temple Avenue Train Diversion
  • Temple Avenue Grade Separation
  • San Gabriel Trench
  • Sunset Avenue Grade Separation
  • Nogales Street Grade Separation
  • Brea Canyon Grade Separation
  • Reservoir Street Grade Separation
  • Orange Avenue Grade Separation
  • Baldwin Avenue Grade Separation

Project Details

Categories
Location San Gabriel Valley, CA