Project Description
As a member of the program management team, Wagner Engineering & Survey, Inc. (WES) has performed GPS control surveys, aerial mapping, right-of-way parcel surveys, prepared over 800 legal descriptions and plat maps for full or partial takings, permanent easements and temporary construction easements over the last 17 years; and performed detailed field surveys for an ongoing construction program of 12 grade separations over and under heavy rail tracks, for over 35-miles. Forty street crossings over railroad tracks were surveyed, mapped and improved physically and/or with signalization for safety improvements. Project locations include:
- Ramona Blvd. Grade Separation
- East End Avenue Grade Separation
- Temple Avenue Train Diversion
- Temple Avenue Grade Separation
- San Gabriel Trench
- Sunset Avenue Grade Separation
- Nogales Street Grade Separation
- Brea Canyon Grade Separation
- Reservoir Street Grade Separation
- Orange Avenue Grade Separation
- Baldwin Avenue Grade Separation
Project Details
Categories | |
Location | San Gabriel Valley, CA |